Smoke and Fire Prevention Systems
Fabri-Lock System


Drawings and Architectural Details
   
  About Our Product
   
 
  1. Gaskets are cut to match the shape of the roof flutes. (Gasket provides smoke tight seal when used with heat resistant caulking.)
  2. 1/2" tubing galvanized and painted to match the fabric.
  3. Fiberglass flame resistant fabric made to our specifications to stop smoke penetration.
  4. Thread is made from the same flame resistant material as our fabric.
  5. Steel tees machined for our system
 
 
   
  About Our Hardware
   
  The Spring Steel Fasteners we use are manufactured from spheroidized annealed high carbon cold rolled steel (ASTM A684, AISI 1005). The Spring Steel Fasteners are heat treated to make the steel hard and give the parts their quality and strength.

Illustrations below show two types of typical connections. We custom design each job to ensure the best possible connection.
   
 

TYPICAL CONNECTION FOR "Z" PURLIN

 Z-Purlin

Click for Larger View


TYPICAL CONNECTION FOR STEEL BEAM

 Steel Beam

Click for Larger View

 
   
Download Our Drawings
   
 
Drawing File Name and Size
Drawing 1 draw1.zip (400 KB)
Drawing 2 draw2.zip (501 KB)
Drawing 3 draw3.zip (519 KB)
Drawing 4 draw4.zip (506 KB)
Drawing 5 draw5.zip (467 KB)
Drawing 6 draw6.zip (467 KB)
Drawing 7 draw7.zip (493 KB)
Drawing 8 draw8.zip (88 KB)
 
 
Parts Drawing File Name and Size
Beam Perp Part 1 (45kb)
Beam Standard Part 2 (45kb)
Con to Wood with Screw Part 3 (45kb)
Conn at Ridge Par Part 4 (49kb)
Conn Perp to Bat Joist Part 5 (54kb)
Conn to Bar Joist Part 6 (72kb)
Conn to Joist Girt Part 7 (69kb)
Conn to Z Purlin Par Part 8 (53kb)
Conn to Z Purlin Perp Part 9 (106kb)
Conn. to Hanger Part 10 (54kb)
Connect to Angle Where Curtain Falls Between Joist Part 11 (56kb)
Connection to Bar Joist STD Drawing Part 12 (363kb)
Connection to Ceiling Grid Part 13 (278kb)
Connection to Concrete Part 14 (44kb)
Connection to Drop in Ceiling Part 15 (49kb)
Connection to Steel W-Beam STD Drawing Part 16 (371kb)
Connection to Wood Struc STD Drawing Part 17 (380kb)
Draftstopping 1 Part 18 (370kb)
Draftstopping 2 Part 19 (341kb)
Draftstopping in Building with Z Purlins Part 20 (329kb)
Drop Gate System Part 21 (139kb)
ISO Beam Connect Part 22 (59kb)
ISO Connect Below Joist Flange Part 23 (58kb)
ISO Connect to Flange Over .75 Part 24 (66kb)
Par Truss Purlin Connect Part 25 (62kb)
Perp Truss Purlin Connect Part 26 (56kb)
Vert. Connection Part 27 (46kb)
Con to Wood with Screw Part 28 (45kb)
Conn at Ridge Par Part 29 (51kb)
Conn Perp to Bat Joist Part 30 (56kb)
Conn to Bar Joist Part 31 (74kb)
Conn to Joist Girt Part 32 (60kb)
Conn to Z Purlin Par Part 33 (60kb)
Conn to Z Purlin Perp Part 34 (115kb)
Conn. to Hanger Part 35 (55kb)
Connect to Angle Where Curtain Falls Between Joist Part 36 (47kb)
ISO Beam Connect Part 37 (58kb)
ISO Connect Below Joist Flange Part 38 (57kb)
ISO Connect to Flange Over .75. Part 39 (65kb)
ISO Joist Connection Part 40 (62kb)
ISO to Diag Brace to Bottom Part 41 (51kb)
ISO to Diag Brace to Mid of Deep Curtain Part 42 (60kb)
ISO to Joist Bottom Cord Part 43 (55kb)
ISO to Top Cord Heavy Truss Part 44 (67kb)
PAR Truss Purlin Connect Part 45 (62kb)
PERP Truss Purlin Connect Part 46 (56kb)
Vert. Connection on Bottom Cord Part 47 (40kb)
 
 
Home | Applications | Drawings & Architectural Details | Specifications | Certified Test Results | Testimonials
Links of Interest | Smoke & Heat Vents | Request for Sample Information | Message from the President | Contact Us
 
©2004. Smoke and Fire Prevention Systems. All Rights Reserved.